BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Pallara Research//Watch//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Pallara Watch
X-WR-CALDESC:Every US energy market deadline Pallara Research tracks\, wit
 h its docket.
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-PUBLISHED-TTL:PT12H
BEGIN:VEVENT
UID:2026-10-29-last-day-for-pjm-to-refile-its-backstop-auction-@research.p
 allara.xyz
DTSTAMP:20261029T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261029
DTEND;VALUE=DATE:20261030
SUMMARY:PJM’s conditional refiling window ends
DESCRIPTION:FERC put PJM's one-time auction for new supply on hold on Sept
 ember 29. FERC anticipated granting a motion for abeyance if PJM submitte
 d a new section 205 filing within 30 days. This is not a bar on later fil
 ings\, and filing alone does not pause briefing.\n\nSource: FERC docket E
 R26-3380\, order 196 FERC ¶ 61\,245 (accession 20260929-3099)\, p. 9\nht
 tps://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-3099&
 optimized=false\n\nAnalysis: https://research.pallara.xyz/articles/pjm-is
 -6831-megawatts-short-ferc-stopped-both-fixes
URL:https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-ferc
 -stopped-both-fixes
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-11-01-cutoff-for-ercot-s-next-stability-study-of-large@research.p
 allara.xyz
DTSTAMP:20261101T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261101
DTEND;VALUE=DATE:20261102
SUMMARY:ERCOT’s scheduled stability assessment cutoff
DESCRIPTION:The August presentation lists November 1 as a prerequisite dea
 dline and associates the assessment with projected Q2 2027 energization.
  Inclusion does not grant approval to energize. Data center approvals rem
 ain a separate verification and community-review question.\n\nSource: ERC
 OT\, Batch Zero Verification and Audit\, presented to the Texas PUC Aug 2
 0\, 2026\, slides 5 and 8\nhttps://www.ercot.com/files/docs/2026/08/20/Ba
 tch-Zero-Verification-and-Audit-PUCT-Presentation.pdf\n\nAnalysis: https:
 //research.pallara.xyz/articles/texas-paused-17-data-centers-at-the-last-
 step
URL:https://research.pallara.xyz/articles/texas-paused-17-data-centers-at-
 the-last-step
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-11-09-pjm-files-its-revised-large-load-registry-rules@research.pa
 llara.xyz
DTSTAMP:20261109T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261109
DTEND;VALUE=DATE:20261110
SUMMARY:PJM files its revised large-load registry rules
DESCRIPTION:FERC kept PJM's 50 megawatt large-load definition and registry
 \, in effect since October 12\, and ordered a compliance filing within 30
  days of October 9. Day 30 is a Sunday\, so FERC's rules move it to Monda
 y.\n\nSource: FERC docket ER26-3515\, order 197 FERC ¶ 61\,019 (accessio
 n 20261009-3055)\, ordering paragraph (B)\; 18 CFR 385.2007\nhttps://elib
 rary.ferc.gov/eLibrary/filelist?accession_number=20261009-3055&optimized=
 false\n\nAnalysis: https://research.pallara.xyz/articles/pjm-is-6831-mega
 watts-short-ferc-stopped-both-fixes
URL:https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-ferc
 -stopped-both-fixes
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-11-20-spp-answers-ferc-on-its-rules-for-big-power-user@research.p
 allara.xyz
DTSTAMP:20261120T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261120
DTEND;VALUE=DATE:20261121
SUMMARY:SPP answers FERC on its rules for big power users
DESCRIPTION:FERC told SPP in June to justify or change how it connects dat
 a centers and other large loads. FERC extended the deadline to November 2
 0.\n\nSource: FERC docket EL26-68\, letter order 20260814-3060\; FERC Off
 ice of Public Participation deadline explanation\nhttps://ferc.gov/cost-t
 ransparency-customer-protection\n\nAnalysis: https://research.pallara.xyz
 /articles/washington-told-spp-to-explain-its-data-center-rules
URL:https://research.pallara.xyz/articles/washington-told-spp-to-explain-i
 ts-data-center-rules
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-11-30-comments-due-on-pjm-s-revised-backstop-cost-split@research.
 pallara.xyz
DTSTAMP:20261130T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261201
SUMMARY:Comments due on PJM’s revised backstop cost split
DESCRIPTION:PJM asked FERC to set November 30 for comments on its October
  29 filing\, which sets each zone's share from utility reports and fixes
  it for 15 years. The date holds only if FERC grants PJM's motion.\n\nSou
 rce: PJM transmittal letter\, FERC docket ER27-330 (accession 20261029-52
 27)\, p. 63\nhttps://elibrary.ferc.gov/eLibrary/filelist?accession_number
 =20261029-5227&optimized=false\n\nAnalysis: https://research.pallara.xyz/
 articles/pjm-filed-backstop-cost-split-each-zone-share-fixed-15-years
URL:https://research.pallara.xyz/articles/pjm-filed-backstop-cost-split-ea
 ch-zone-share-fixed-15-years
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-12-09-pjm-s-capacity-auction-for-2029-to-2030-opens@research.pall
 ara.xyz
DTSTAMP:20261209T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261209
DTEND;VALUE=DATE:20261210
SUMMARY:PJM’s scheduled capacity auction opening
DESCRIPTION:December 9 is the planned opening in the timetable described b
 y FERC’s September order\; it remains subject to subsequent scheduling
  changes. The last two came up 6\,623 and 6\,831 megawatts short of the r
 eliability requirement.\n\nSource: FERC docket ER26-3380\, order 196 FERC
  ¶ 61\,245 (accession 20260929-3099)\, pp. 2\, 8\nhttps://elibrary.ferc.
 gov/eLibrary/filelist?accession_number=20260929-3099&optimized=false\n\nA
 nalysis: https://research.pallara.xyz/articles/pjm-is-6831-megawatts-shor
 t-ferc-stopped-both-fixes
URL:https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-ferc
 -stopped-both-fixes
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-12-10-ercot-reports-which-batch-zero-projects-passed-v@research.p
 allara.xyz
DTSTAMP:20261210T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261210
DTEND;VALUE=DATE:20261211
SUMMARY:ERCOT’s planned Batch Zero verification report
DESCRIPTION:ERCOT’s August presentation planned the eligibility report f
 or December 10. Projects that couldn't back up their filings with documen
 ts are at risk.\n\nSource: ERCOT\, Batch Zero Verification and Audit\, pr
 esented to the Texas PUC Aug 20\, 2026\nhttps://www.ercot.com/files/docs/
 2026/08/20/Batch-Zero-Verification-and-Audit-PUCT-Presentation.pdf\n\nAna
 lysis: https://research.pallara.xyz/articles/unverifiable-now-costs-the-s
 ame-as-false
URL:https://research.pallara.xyz/articles/unverifiable-now-costs-the-same-
 as-false
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-12-17-texas-utility-regulator-meets-after-the-batch-ze@research.p
 allara.xyz
DTSTAMP:20261217T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20261217
DTEND;VALUE=DATE:20261218
SUMMARY:Texas utility regulator meets after the Batch Zero report
DESCRIPTION:The Public Utility Commission of Texas has a scheduled open me
 eting after ERCOT’s planned report. This listing establishes neither th
 e agenda nor a decision on energization approvals.\n\nSource: ERCOT calen
 dar\, PUCT Meeting\, December 17\, 2026\nhttps://www.ercot.com/calendar/1
 2172026-PUCT-Meeting\n\nAnalysis: https://research.pallara.xyz/articles/u
 nverifiable-now-costs-the-same-as-false
URL:https://research.pallara.xyz/articles/unverifiable-now-costs-the-same-
 as-false
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2026-11-13-briefs-due-in-the-hearing-on-pjm-s-backstop-auct@research.p
 allara.xyz
DTSTAMP:20261027T000000Z
SEQUENCE:1
DTSTART;VALUE=DATE:20270111
DTEND;VALUE=DATE:20270112
SUMMARY:Initial briefs due on PJM’s backstop procurement
DESCRIPTION:FERC’s October 23 notice moved initial briefs from November
  13 to January 11\, 2027 at 5 p.m. The notice responds to PJM’s abeyanc
 e motion and establishes new briefing dates.\n\nSource: FERC notice\, ER2
 6-3380 and EL26-108\, accession 20261023-3114\, October 23\, 2026\nhttps:
 //www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20261023-notice-
 extending-deadlines-for-initial-briefs-reply-briefs-in-el26-108-000-et-al
 .pdf\n\nAnalysis: https://research.pallara.xyz/articles/pjm-is-6831-megaw
 atts-short-ferc-stopped-both-fixes
URL:https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-ferc
 -stopped-both-fixes
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:pjm-backstop-reply-briefs@research.pallara.xyz
DTSTAMP:20261027T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20270126
DTEND;VALUE=DATE:20270127
SUMMARY:Reply briefs due on PJM’s backstop procurement
DESCRIPTION:FERC’s October 23 notice moved reply briefs from December 3
  to January 26\, 2027 at 5 p.m.\n\nSource: FERC notice\, ER26-3380 and EL
 26-108\, accession 20261023-3114\, October 23\, 2026\nhttps://www.pjm.com
 /-/media/DotCom/documents/ferc/filings/2026/20261023-notice-extending-dea
 dlines-for-initial-briefs-reply-briefs-in-el26-108-000-et-al.pdf\n\nAnaly
 sis: https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-fe
 rc-stopped-both-fixes
URL:https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-ferc
 -stopped-both-fixes
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2027-01-29-pjm-asks-ferc-to-rule-on-its-backstop-cost-split@research.p
 allara.xyz
DTSTAMP:20270129T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20270129
DTEND;VALUE=DATE:20270130
SUMMARY:PJM asks FERC to rule on its backstop cost split
DESCRIPTION:PJM asked FERC to act on all of its October 29 filing by this
  date\, the day the utility reporting rule would take effect. FERC is not
  bound by the requested date.\n\nSource: PJM transmittal letter\, FERC do
 cket ER27-330 (accession 20261029-5227)\, pp. 1-2\nhttps://elibrary.ferc.
 gov/eLibrary/filelist?accession_number=20261029-5227&optimized=false\n\nA
 nalysis: https://research.pallara.xyz/articles/pjm-filed-backstop-cost-sp
 lit-each-zone-share-fixed-15-years
URL:https://research.pallara.xyz/articles/pjm-filed-backstop-cost-split-ea
 ch-zone-share-fixed-15-years
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2027-02-28-pjm-s-suspended-backstop-auction-rules-take-effe@research.p
 allara.xyz
DTSTAMP:20270228T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20270228
DTEND;VALUE=DATE:20270301
SUMMARY:PJM’s ordered backstop effective date
DESCRIPTION:FERC accepted the backstop auction and suspended it for five m
 onths\, subject to refund and further Commission proceedings. This is an
  ordered tariff date\, not a confirmed auction date.\n\nSource: FERC dock
 et ER26-3380\, order 196 FERC ¶ 61\,245 (accession 20260929-3099)\, orde
 ring paragraph (A)\nhttps://elibrary.ferc.gov/eLibrary/filelist?accession
 _number=20260929-3099&optimized=false\n\nAnalysis: https://research.palla
 ra.xyz/articles/pjm-is-6831-megawatts-short-ferc-stopped-both-fixes
URL:https://research.pallara.xyz/articles/pjm-is-6831-megawatts-short-ferc
 -stopped-both-fixes
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2027-03-01-pjm-s-backstop-auction-for-new-supply-would-open@research.p
 allara.xyz
DTSTAMP:20270301T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20270301
DTEND;VALUE=DATE:20270302
SUMMARY:PJM's backstop auction for new supply would open for bids
DESCRIPTION:Proposed. PJM’s October 22 member presentation shows a March
  1 to March 22\, 2027 bid window. This is a proposed procurement timetabl
 e\, not an approved auction date.\n\nSource: PJM\, Special Members Commit
 tee consultation on the backstop filing\, Oct 22\, 2026\, slide 16\nhttps
 ://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/202610
 22-special/item-01---1-tariff-section-92b-stakeholder-consultation-of-upc
 oming-205-filing-on-reliability-backstop-procurement---presentation.pdf\n
 \nAnalysis: https://research.pallara.xyz/articles/pjm-backstop-bill-follo
 ws-data-centers-fixed-for-15-years
URL:https://research.pallara.xyz/articles/pjm-backstop-bill-follows-data-c
 enters-fixed-for-15-years
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2027-05-03-pjm-would-post-its-backstop-auction-results@research.pallar
 a.xyz
DTSTAMP:20270503T000000Z
SEQUENCE:0
DTSTART;VALUE=DATE:20270503
DTEND;VALUE=DATE:20270504
SUMMARY:PJM would post its backstop auction results
DESCRIPTION:Proposed. PJM's October 22 timeline sets the final target and
  supply on April 21\, 2027 and posts results May 3. Contracts run up to 1
 5 years.\n\nSource: PJM\, Special Members Committee consultation on the b
 ackstop filing\, Oct 22\, 2026\, slide 16\nhttps://www.pjm.com/-/media/Do
 tCom/committees-groups/committees/mc/2026/20261022-special/item-01---1-ta
 riff-section-92b-stakeholder-consultation-of-upcoming-205-filing-on-relia
 bility-backstop-procurement---presentation.pdf\n\nAnalysis: https://resea
 rch.pallara.xyz/articles/pjm-backstop-bill-follows-data-centers-fixed-for
 -15-years
URL:https://research.pallara.xyz/articles/pjm-backstop-bill-follows-data-c
 enters-fixed-for-15-years
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
