Provenance record

Unverifiable now costs the same as false. Every claim below carries its primary source, retrieval date, and verification method. What was not verified is listed as its own section.

Revision note, October 26, 2026. This provenance record and its signature describe the original October article. The current editorial revision changes its title and explanatory wording. The historical signature does not authenticate the revised article. Its source references remain available below.

Article

TitleUnverifiable now costs the same as false
URLhttps://research.pallara.xyz/articles/unverifiable-now-costs-the-same-as-false
Published2026-10-10
Body SHA-25688326bfc81e5db71eb160c145dc87a2b7038d5c17708cd657242d53ccb2b5a1f

Method

Stated by Pallara, not inferred by a classifier. A binary authorship label reports one bit. This reports the work.
StagePerformed byDetail
Source discoveryMachine, ClaudeAdoption order fetched on the founder Mac from interchange.puc.texas.gov, the docket listing for Item 218 read in a browser. Prior verified facts read from kernel/obligations.yaml (parameters.adopted_25_194). Coverage search by web search and direct fetch.
Primary-source verificationMachine, ClaudeEvery rule-text claim read from pdftotext extraction of the order PDFs and matched to its printed page number. No figure entered the draft from model recall.
DraftingMachine, ClaudeProse drafted by a language model. Any AI-assistance label a platform applies to this text is correct.
FiguresMachine, ClaudeRendered from skills/pallara-press/references/figures/02-unverifiable.figures.json. Figure 4 is illustrative arithmetic computed by Pallara, labelled as such.
Publication decision and responsibilityPreston JonesPallara, Inc. is responsible for every claim published here regardless of which stage was machine performed.

Verified against a primary source (16)

§25.194(j)(2): information that is false, inaccurate, or cannot be verified through supporting documentation may lead to forfeiture of security posted under the rule or Planning Guide Section 9, and reallocation of capacity.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684656.PDF
Retrieved
2026-10-10
Method
Rule text read at order p. 268. Quoted phrase verbatim.
§25.194(h)(2): all information provided or attested to under Planning Guide Section 9 is subject to audit and verification; failure to produce supporting documentation may lead to enforcement including loss of allocated capacity.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684656.PDF
Retrieved
2026-10-10
Method
Rule text read at order pp. 263-264.
Adopted September 18, 2026 (Item 218); published 51 TexReg 6875, October 2, 2026; effective date October 8, 2026 per the Register entry.verified
Source
https://www.sos.state.tx.us/texreg/archive/October22026/Adopted%20Rules/16.ECONOMIC%20REGULATION.html#66
Retrieved
2026-10-02
Method
Recorded in kernel/obligations.yaml adopted_25_194.texas_register, hash-matched; Item 218 docket listing re-read in browser 2026-10-10.
ERCOT defines an attestation as the developer's legal declaration that it satisfies the requirement; schedules further RFIs and cure opportunities for October to November 2026, the eligibility verification report for December 10, and an open meeting December 17.verified
Source
https://www.ercot.com/files/docs/2026/08/20/Batch-Zero-Verification-and-Audit-PUCT-Presentation.pdf
Retrieved
2026-10-11
Method
PDF downloaded and read; definition on slide 11 legend, schedule on slide 10.
24-month non-utilization: notice to ERCOT within 30 days; within 60 days draw security, apply to amounts owed, subtract 20% of security associated with non-utilized capacity, return the balance.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684656.PDF
Retrieved
2026-10-10
Method
Rule text §25.194(g)(1)-(3), order pp. 258-259.
Order preamble at p. 212 describes the return of the balance after amounts owed without the 20% subtraction; the March proposal refunded 20% of the balance with 80% offsetting TSP rate base.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684656.PDF
Retrieved
2026-10-10
Method
Order pp. 211-213 read directly.
Utility Dive (Sept 21, 2026) and White & Case (Sept 25, 2026) describe the return without the 20% subtraction.verified
Source
https://utilitydive.com/news/texas-puc-adopts-data-center-interconnection-rules/830899
Retrieved
2026-10-10
Method
Both pages fetched; wording matched to the preamble. White & Case URL https://www.whitecase.com/insight-alert/puct-sets-financial-commitments-data-center-interconnection-governor-pauses-permit
SLLIA security includes a $50,000 per MW of contracted peak demand leg; the $10,000, $40,000 and $50,000 per-MW returns are computed by Pallara assuming zero amounts owed.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684656.PDF
Retrieved
2026-10-10
Method
§25.194(f)(2)(B) at order p. 251. Arithmetic computed, not quoted.
The Commission adopted Targa's recommendation to eliminate submission of underlying plans, studies, or permit applications, required disclosure supported by an officer attestation, and stated ERCOT or Commission staff may request the underlying documents to verify.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684654.PDF
Retrieved
2026-10-10
Method
Commission response read at order p. 91.
The Commission declined Constellation's written-confirmation proposal because written confirmation alone does not provide sufficient assurance.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684654.PDF
Retrieved
2026-10-10
Method
Order p. 81, quoted verbatim.
ERCOT may request information, including competitively sensitive information, at any point in the interconnection process; adopted §25.194(j) added for this.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684654.PDF
Retrieved
2026-10-10
Method
Commission response read at order pp. 87-88.
Site control: disclosure of the property interest rather than underlying documentation; staff may request the documentation in audit.verified
Source
https://interchange.puc.texas.gov/Documents/58481_218_1684655.PDF
Retrieved
2026-10-10
Method
Commission response read at order pp. 160-161.
Slide 12 lists the evidence submitted with each Batch Zero eligibility package: eleven requirements carry an entry (site verification is N/A), and seven of those entries are 'Attestation': long-lead equipment, notice to proceed, end-use customer confirmation, site approvals, binding GC contract, binding substation contractor contract, affiliate form. The same slide lists the additional documents ERCOT may request for each.verified
Source
https://www.ercot.com/files/docs/2026/08/20/Batch-Zero-Verification-and-Audit-PUCT-Presentation.pdf
Retrieved
2026-10-11
Method
PDF downloaded, slide 12 rendered to PNG and read visually; rows counted, not quoted as a total.
Slide 11 legend defines A = Attestation as the developer's legal declaration that it satisfies the requirement; requirements unique to path (e) are long-lead equipment, notice to proceed, end-use customer confirmation, and unique to path (f) are site approvals, binding GC contract, binding substation contractor contract, all coded A.verified
Source
https://www.ercot.com/files/docs/2026/08/20/Batch-Zero-Verification-and-Audit-PUCT-Presentation.pdf
Retrieved
2026-10-11
Method
Slide 11 rendered to PNG and read visually; check marks mapped to columns by eye and against pdftotext layout.
Slide 10: large loads that do not pass verification, or do not respond, will be disqualified from Batch Zero.verified
Source
https://www.ercot.com/files/docs/2026/08/20/Batch-Zero-Verification-and-Audit-PUCT-Presentation.pdf
Retrieved
2026-10-11
Method
pdftotext extraction of slide 10.
ERCOT issued conditional Batch Zero classifications to DSPs and TSPs on September 3, 2026, with inclusion conditioned on passing verification.verified
Source
https://www.ercot.com/services/comm/mkt_notices/M-A080326-04
Retrieved
2026-09-27
Method
Recorded in kernel/obligations.yaml batch_zero classification block (issuance_terms), re-baselined 2026-09-27.

Limits of this record

Signature

AlgorithmEd25519
Public key
Signaturet++EkuTpiysWYOGCCOcDsAshStVlqJ9YSWvt22w7frJtKeJFjsZ9IKEqUf/WedLFilTIfnwEukRYUiBRiRMRCw==
Verifyuv run python kernel/sign.py verify 02-unverifiable.provenance.md